Have a look to get inspired!
Our tutorials focus on the practical application of DIGSI 5 and the SIPROTEC DigitalTwin simulation for enhanced system reliability and efficiency.
A few highlights:
- How to Use DIGSI 5 and SIPROTEC DigitalTwin to set up mode test in CPC solutions with 7SX85
- Close Loop test for CPC solutions using SIPROTEC DigitalTwin
- Typical Engineering with DIGSI 5 in CPC solutions
- Efficient centralized protection Engineering with DIGSI 5
- Virtual closed loop test in a small hydrogeneration substation with CPC
- Virtual protection selectivity test in centralized protection scheme



