18,000+ chargers installed. 800+ projects delivered.

Proven expertise in electrifying depot and public charging infrastructure worldwide

We work with pioneers and forward-looking partners who share our vision of integrating eMobility into everyday life. Explore selected customer cases that show how our integrated approach - combining hardware, software, and services - turns charging challenges into reliable, scalable infrastructure solutions.

Explore our stories….


BUS

Transport UK London Bus

Challenge:

Electrify a historic inner-city bus depot in London while enabling 34 buses to charge simultaneously and keeping the depot fully operational throughout the upgrade.

Solution:

For Walworth Depot, we delivered an integrated depot solution including charging infrastructure, a new substation, power distribution switchgear and a flexible busbar system. Combined with DepotFinity, financing options and service support, the solution helps ensure reliable operations with more than 99% charger availability.

A double-decker bus pulls out of a line at the bus depot in London.
Several Hochbahn busses lined up at the Hamburg bus depot.

Hamburger Hochbahn

Challenge:

Hamburg is a pioneer in sustainable mobility. By the early 2030s, the entire HOCHBAHN fleet is set to transition to zero-emission drives, requiring charging solutions tailored to different depot requirements.

Solution:

We have equipped six HOCHBAHN sites with 370 charging points, delivering charging solutions tailored to on-site requirements and supported by a tailored service agreement.

TRUCK

Nanno Janssen

Challenge:

Support a logistics company in electrifying its regional and long-haul transport operations with a future-ready depot charging setup for a growing eTruck fleet.

Solution:

At the Leer depot, we installed 10 SICHARGE D chargers with 20 charge points in total. The solution combines energy management, 1.2 MW battery storage and 800 kW solar power to support efficient charging for the growing eTruck fleet.

An ariel view of four electric semi-trucks at the charging pumps of a Nanno Janssen facility.
A man charging an electric SUV at a public, high-speed charging station.

PUBLIC

Ortner

Challenge:

Develop a high-traffic public charging hub for electric cars and trucks that combines fast charging with an integrated energy concept.

Solution:

In upper Austria, we delivered 10 chargers with 20 charge points, supported by 1.5 MW battery storage, 800 kW solar power and 3 MW installed capacity. The hub also integrates Siemens EA to help optimize energy management across the site.

EWII

Challenge:

Build a nationwide fast-charging network across Denmark while equipping public parking locations with scalable high-power charging infrastructure.

Solution:

For the first rollout, we supplied 75 SICHARGE D 240/300 kW chargers and 30 dispensers, supported by a long-term service agreement for maximum uptime. The frame agreement also provides for future 400 kW chargers to further expand the network.