41k EOH Maintenance Concept (41MAC)

image
Valid for following frames: SGT5-2000E (V94.2), SGT6-2000E (V84.2)

Life extension of numerous hot gas path components


Enhanced operational availability

Siemens Power Generation Services Customer Extranet Portal for owners/operators
Register

General Product Information

Improved hardware extend the maintenance intervall of your gas turbine

The Siemens 41k EOH Maintenance Concept for Siemens Gas Turbines can yield an increase in reliability, flexibility and help maintain availability.

The 41k EOH Maintenance Concept (41MAC) involves the replacement or modification of key turbine components which is intended to extend the lifetime of gas turbine components and reduce lifecycle costs. Implementation of 41MAC also extends Siemens’ recommended scheduled maintenance intervals. The 41MAC features new coatings for turbine blades, advanced inner casing and mixing chamber design as well as the implementation of a new HR3 burner.

 

The 41MAC upgrade provides significant performance advantages and offers attractive financial payback options.

Your benefits

image

The 41k EOH Maintenance Concept is a modernization package designed to increase important key qualities of Siemens Gas Turbines.

 

The benefits may include:

  • Life extension of numerous hot gas path components
  • Enhanced operational availability
  • Extended recommended scheduled maintenance intervals
  • Deferral of investment for outages
  • Reduction of life cycle cost


The 41k EOH Maintenance Concept can be a very cost-effective way to reduce life cycle costs, to enhance reliability and to sustain the operational flexibility of your power plant. The implementation of this enhanced maintenance concept can fit best into a maintenance schedule after 100,000 EOH in the framework of the Lifetime Extension maintenance but can also be implemented at any other major maintenance activity.

 

The Siemens 41k EOH Maintenance Concept is applicable for SGT5-2000E (V94.2) and SGT6-2000E (V84.2) frames and has been state-of-the-art for new Siemens Gas Turbines of the frame types SGT5-2000E (V94.2) and SGT6-2000E (V84.2) for more than 10 years.

 

The Siemens 41k EOH Maintenance Concept is one Modernization package among many others that represent Siemens’ state-of-the-art technology in gas turbines.

Scope of Supply

The scope of this modernization may include:

  • Advanced mixing chamber design
  • Advanced inner casing design
  • New coatings and aluminized inner surface on turbine blades and vanes stage 1 and turbine vanes stage 2
  • HR3 burner and flame tube modification

 

The Siemens 41k EOH Maintenance Concept can be combined with other Siemens Gas Turbine modernizations designed to enhance the overall performance of your gas turbine e.g. the Firing Temperature Increase and the Siemens innovative 3D optimized turbine blades and vanes.


We recommend a major outage or a Life Time Extension outage to implement the 41k EOH Maintenance Concept upgrade. We offer a full range of field service capabilities to help you manage your maintenance and outage schedules.

Click here to get the product information as a PDF:
41 k EOH Maintenance Concept

Customer Extranet Portal

Sign in

For owners/operators we offer further information on your equipment. Please register to the Siemens Power Generation Services Customer Extranet Portal.

Siemens Power Generation Services Customer Extranet Portal
Register