Compliance with UL listed systems
Operate with confidence. Our UL listed utility paralleling systems meet rigorous safety and performance standards.
Utility Paralleling Systems manage the connection and transfer of power between utility sources and on-site generators. These systems deliver a reliable and uninterrupted power supply for your operations.
Power interruptions can disrupt critical operations and lead to significant downtime. Our systems allow for power transfer between generators and utility sources. We use active synchronization and soft loading for smooth transitions to maintain continuous power without disturbance.
All systems are UL listed, providing assurance of safety and quality. Redundant PLC controls enhance system reliability and operational stability. Configure systems for peak shaving or utility-sponsored load curtailment programs to optimize energy costs and improve efficiency.
Choose momentary paralleling for rapid transfers or sustained paralleling for soft loading. Tailor power management to your operations to minimize disruption and maintain stable power delivery.
Test systems in closed-transition mode without load interruption. Parallel generator sets with the utility on power return, then retransfer the load via closed-transition for continuous operation.
Configure your system for peak shaving to lower energy costs. Support utility-sponsored load curtailment programs for incentives and grid stability. Optimize energy consumption and operational expenses.
Operate with confidence. Our UL listed utility paralleling systems meet rigorous safety and performance standards.
Use selector switches for open or closed transitions to manage power flow. Automatically or manually parallel generator and utility sources. Retransfer to the normal source with precision for flexible power distribution control.
Achieve precise power transfer with active synchronization. Use redundant PLC controls for system reliability and continuous operation, or soft loading power transfer to minimize disturbances during load changes.