South Koreas' president visits Siemens gas turbine plant
South Koreas' president visits Siemens gas turbine plant
South Koreas' president visits Siemens gas turbine plant
Transportation of the rotor to the assembly stand
Transportation of the rotor to the assembly stand
Every millimeter is crucial - installtation of the rotor
Every millimeter is crucial - installtation of the rotor
Every millimeter is crucial - installtation of the rotor
Every millimeter is crucial - installtation of the rotor
Every millimeter is crucial - installtation of the rotor
Every millimeter is crucial - installation of the rotor
SGT5-8000H gas turbine in the Siemens assembling halls in Berlin
CCGT power plant with district heating extraction in Lausward, Düsseldorf – three world records.
CCGT power plant with district heating extraction in Lausward, Düsseldorf – three world records.
SGT5-8000H gas turbine in the Siemens assembling halls in Berlin
SGT5-8000H gas turbine in the Siemens assembling halls in Berlin
Mandela School of Science & Technology opens in South Africa
Furnace cleaner: When the printer is finished, large quantities of metal powder are left behind – and must be carefully removed
Shower of sparks: Lasers fuse metal powder
Fire and flame: High temperature, high yield
High centrifugal forces: Heat isn't the only thing impacting the steel
Layer by layer: The fine structure has to be ground down
More complex shapes: Traditional processes such as casting and drilling have reached their limit
From square to round – More freedom in product design
We’ve come a long way since Gutenberg: Olaf Rehme analyzes a CAD model for his next printed object
The world's hardest tree? - Siemens researcher prints Christmas trees from gas turbine steel
The best photos by e-mail: we’ll be happy to notify you about the monthly image collections.